Construction of six high specification industrial units and all necessary infrastructure works. Site deemed necessary for full SUDS drainage system and On-site treatment of contaminated soil.


In association with the industrial units part of the site was to have a railway turntable constructed to receive a refurbished turntable to suit local steam railway craned onto prepared structure with exact tolerances. In association to railway turntable café and covered walkway to be contructed.

Austin and Hobbs Ltd instructed to prepare competitive tender and once secured instructed to carry out full surveying duties including sub-contract procurement through to Final Account.

Project Value: 3.5 Million